CRESTECH ONSHORE PROJECT REFERENCES
Client
Location
Description
Contract type
Hours
Year
CHEVRON
Swamp
FEED
2007
CHEVRON
Swamp
FEED
2007
FEED
2007
Onshore
FEED/DED
2007
Onshore
Pre-FEED
2007
CHEVRON
Onshore
Onshore Asset Gas Management – Gas gathering from 6 platforms
Detailed Design
80,000
2008
SAHARA
Onshore
Aviation Storage Facility for Abuja, Kano, PHC & Calabar
Detailed Design
10,000
2009
SEPLAT
Onshore
Liquid Treatment Facility (LTF) Phase 1 Project
Detailed Design
6,084
2012
NLNG
Onshore
IA Workshop Refurbishment and External Building Industrial Area
Detailed Design
8,500
2013
NLNG
Onshore
NLNG Bonny Vocational Center Project
Detailed Design
24,700
2014
SNEPCO
Onshore
Proposed Shoreline Protection/Jetty Design in Polaku, Bayelsa
Concept & FEED
9,200
2014
SEPLAT
Onshore
Sapele Flowstation Debottlenecking
Studies
2,581
2015
NLNG
Onshore
PTL Building Project
Concept & Basic
2,232
On-going
CRESTECH OFFSHORE PROJECT REFERENCES
Client
Location
Description
Contract type
Hours
Year
MOBIL
Offshore
Bosi FPSO – Study for selected modules & fabrication capacity survey
Study
25,000
2005
TOTAL
Offshore
Basic Engineering
1,000
2006
CHEVRON
Offshore
EGP-3B Project
FEED
24,000
2006
TOTAL
Offshore
AKPO FPSO-Participation
DED
23,000
2006
CHEVRON
Offshore
EGP – 3B
DED
100,000
2007
MOBIL
Offshore
Iyak SA/SB Wellhead Development
FEED
2008
CHEVRON
Offshore
EGP – 3B, Stage 1, Stage 2
Follow-On Engineering
8,000
2008
MOBIL
Offshore
INIM Asset As Built
PM on Laser scanning
2008
TOTAL
Offshore
Egina FPSO (Leader of Consortium of three companies)
Basic Engineering
130,000
2009
MOBIL
Offshore
ASABO Additional Gas Generator follow-on engineering
DED
6,000
2009
MOBIL
Offshore
ETIM Life Extension & Repairs
DED
10,000
2010
MOBIL
Offshore
IYAK SB Slot Addition Project
DED
10,040
2010
CHEVRON
Offshore
EGP-3B Additional Engineering (AE)
AE
390
2011
MOBIL
Offshore
Design Verification and Fabrication Assurance for Ubit GA/GC Slot Additional Project
DV
430
2011
TOTAL
Offshore
(Crestech as Engineering Subcontractor to Nigerdock as EPC Contractor)
DED
166,000
2013
SNEPCO
Offshore
Mechanical Static Design, Piping Data Sheets, Instrumentation (PACO) Design Data Sheets, Process & Utility Data Sheets.
FEED
10,000
2013
TOTAL
Offshore
IKIKE WHP Conceptual Study and FEED Optimization Project
FEED
8,400
2013
NLNG
Offshore
IA Workshop Refurbishment and External Building Industrial Area
DED
8,500
2013
Subsea 7
Offshore
ERHA North Phase 2 Project – EPC2
DED
50,000
2014
TOTAL
Offshore
IKIKE WHP Project
FEED
52,000
2014
APL/NOV
Offshore
Egina Buoy Project
DED
58,000
TOTAL
Offshore
OFON Phase 2 Project (Subcontractor to Nigerdock)
Construction Follow-on Engineering
60,000