Egina-FPSO-Oil-Platform-project

Egina FPSO offshore Basic Engineering project for Total Upstream Nigeria (TUPNI) 
Front End Engineering Design [FEED] from February 2009 - March 2010.

akpo1 jumpers projectAkpo Jumpers project for Delattre Bezons Nigeria (DBN) 
A 1,500 manhours project for the contruction of isometrics and stress analysis of jumpers for Akpo project, March 2010 - December 2010.

brownfield_modificationsEGP3B Brownfield production platform modifications project for Chevron Nigeria Limited (CNL) 
3,500 manhours  for Detailed Engineering Design (DED) April 2010 - May 2010.

Exxon_MobilEtim project for Mobil (MPN) 
A 10,000 manhours Etim Life extension Repairs Project [Phase II Review] December 2009 - April 2010.

Exxon_MobilAsabo project for Mobil (MPN)
A 5,600 manhours Asabo additional generator project [Follow - on Engineering] September 2009 - December 2009.

escravos gas projectEgina FPSO offshore Basic Engineering project for Total Upstream Nigeria (TUPNI) 
Front End Engineering Design [FEED] from February 2009 - March 2010.

saharaOnshore Aviation Storage facility for Sahara group
5,500 manhours onshore location in Port harcourt for a Detailed Design contract in 2009 for Sahara group.
3,800 manhours onshore location in Abuja for a Detailed Design contract in 2009 for Sahara group.

Exxon_MobilOffshore Iyak SA / SB Wellhead Development project for MOBIL
5,000 manhours offshore FEED contract in 2008 for MOBIL.

Exxon_MobilINIM As-Built Project for MOBIL
5,100 manhours As-built contract for Mobil in 2008.

 

escravos gas projectEscravos Gas Project (EGP 3B) stages 1, 2, & 3 [upgrading]
8,000 manhours Detailed Design contract on an onshore / offshore site for Chevron in 2008.

technip-logoOK-LNG (Secondment) for Technip
100,000 manhours Pre-FEED onshore contract in 2008 for Technip.

chevronOn shore asset gas management [OAGM] Project for Chevron
An onshore 78,700 manhours Detailed Design contract in the third quarter of 2008 for Chevron.

Agip_logoAkri-Oguta pipeline Project for NAOC
Onshore / offshore 6,000 manhours FEED contract in the third quarter of 2007 for Nigeria Agip Oil Company.

technip-logoOk-LNG project for Technip Italy
A 4,700 pre-FEED onshore / offshore contract for Technip Italy in the thrid quarter of 2007.

ShellOgunu Fuel Depot project for SPDC
In the first quarter of 2007, a 15,000 manhours Detailed Design onshore contract for Shell Producing Development Company [SPDC].

Agip_logoOnshore Brass LNG Project for NAOC
 A 27,000 manhours FEED contract in the first quarter of 2007 for an onshore location for the Nigerian Agip Oil Company [NAOC].

chevronSwamp facility upgrade Project for Chevron
In the fourth quarter of 2007, a 21,700 manhours FEED contract for the south swamp facility upgrade as well as a 13,100 manhours FEED contract for the North swamp facility was implemented for Chevron.

chevronEscravos Gas Project (EGP 3B - DD) for Chevron
In another joint venture with Technip on an onshore / offshore location. A 97,800 manhours Detailed Design contract in the first quarter of 2007 for Chevron Nigeria Ltd.

chevronEscravos Gas Project (EGP 3B - FEED) for Chevron
24,000 manhours joint venture with Technip in the first quarter of 2006. A FEED contract for Chevron Nigeria Ltd on an onshore location.

totalAkogen Phase 2 / Amp 2 Project for Total
1000 manhours Basic Design contract for Total.

Exxon_MobilBosi FPSO offshore Project for Mobil
25,000 manhours FEED contract for Mobil in 2005 for an offshore FPSO.

chevronDibi / Olero Creek temporary production for Chevron
1,530 manhours FEED contract on a swamp location in 2005 for Chevron Nigeria Ltd.