Ikike Wellhead Platform FEED Verification (TOTAL)
FEED optimisation for 12-Slot Wellhead Platform and design of tie-ins to host platform (52,000man-hours).
Erha North Phase 2 FPSO Topside Modification (ExxonMobile)
Detailed Engineering for brown field modifications of the existing FPSO topside facilities as part of development of additional subsea wells (70,000man-hours).

OFON Phase 2 Wellhead Platforms/Bridges Detailed Design (TOTAL) – 166,000 man-hours

EGINA FPSO FEED – as part of Consortium (TOTAL)
Overall project and interface management, system definition, process and safety design, two modules and pipe rack design (136,000man-hours).

OAGM FEED and Detailed Design (CHEVRON)
Gas gathering for 6 offshore platforms and associated onshore facilities (115,000man-hours).

EGP3B FEED and Detailed Design (CHEVRON)
Design of Gas Gathering Compression Platform (GGCP) and Modification of 9 offshore production platforms for gas gathering for the CNL flare-out campaign (140,000man-hours).

Installation Engineering Design of Deepwater Subsea Jumpers
Design of production, water injection and multiphase jumpers for subsea flow lines as part of FPSO subsea tie-backs. (>5,000man-hours).

Brass LNG Upstream Project (AGIP)
FEED for 2 flow stations modification and 6 new gas pipelines (31,700man-hours).